Recently our Waldorf Astoria Hotel and Residences Miami achieved a remarkable milestone with a historic foundation pour led by John Moriarty & Associates alongside CAPFORM. Over 31 uninterrupted hours, 195 construction workers and a continuous rotation of 1,240 trucks delivered over 12,400 cubic yards of concrete to the development site. This monumental effort marks the beginning of the vertical construction for the supertall tower.
Watch the video below capturing the impressive undertaking.
Greybrook, along with partners PMG, Mohari Hospitality, S2 Development, and Hilton (NYSE: HLT), recognize the monumental efforts made by all teams involved. “Reaching this important milestone is a testament to the effort and dedication put forward by our respective development organizations,” said Peter Politis, CEO of Greybrook Realty Partners. “This achievement underscores our commitment to delivering this landmark project, and as the project advances into the vertical construction phase, we look forward to bringing this impressive structure to life.”
Located at 300 Biscayne Boulevard, the 1,049-foot tower will feature nine spiraling, offset glass cubes that distinguish the property’s architecture from anything else on the East Coast. The tower’s concept design is led by Sieger Suarez Architects, in collaboration with renowned architect Carlos Ott and award-winning interior design firm BAMO, who worked in tandem to create an iconic structure in Downtown Miami.
As the Waldorf Astoria Hotel and Residences Miami begins to rise, it signifies a new chapter in Miami’s skyline as the city’s first supertall tower.